关键统计数据
英国净零目标:
2050
每年捕获的碳:
800万吨
No. 受影响的植物:
三个
The UK has committed to reducing carbon emissions to net zero by 2050 and this can only be achieved by decarbonising existing industry effectively. 能源 intensive industries account for more than 20% of the Humber’s economy and 1 in 10 jobs. 亨伯河零 is a project with immediate impact for reduced emissions, whilst preserving jobs in these critical industries and maintaining the Humber’s role as an industrial hub.

Wood  is developing the master plan and early design for the 亨伯河零 carbon reduction programme, spanning three power and petrochemical plants at Immingham, UK. 在接下来的十年里, 我们将开发捕捉的技术, 治疗, and compress up to 800万吨 of carbon dioxide per annum for permanent storage in geological formations beneath the North Sea.

亨伯河零 incorporates a cluster of energy-intensive industries that lie on the south bank of the River Humber. 关闭 to offshore gas storage fields and sitting along a key pipeline route identified by National Grid to connect and decarbonise other key industry in the southern Humber, it is an ideal gateway project for large-scale decarbonisation in the wider region.

实现雄心勃勃的能源目标的路线图

拥有数十年的多部门经验, Wood is focused on driving the global energy transition and enabling such flagship projects which could become a model for industrial decarbonisation around the world. It will also play an important role in helping the UK government meet its ambitious energy targets, 包括到2050年实现净零排放.

Evaluating the specific needs of different industrial processes on three operating sites has led to a plan involving several complementary technologies, including use of renewable power to generate green hydrogen through electrolysis, generation of blue hydrogen with integrated carbon capture, and post-combustion carbon capture from existing stacks.

Establishing a local network of both 氢 and CO2 in the Immingham area will allow the region to expand its decarbonisation initiatives in future, and act as hubs to encourage growth of new technologies such as green hydrogen.

从水边拍摄的亨伯桥照片
“We are pleased that the 亨伯零号项目 will benefit from Wood’s technical and industry expertise. The project’s success will depend on careful, detailed planning and flawless execution. Wood are well placed to help us deliver this industry-leading project.”
Jonathan Briggs, Project Director at VPI Immingham

Enabling a holistic view of key performance indicators

Using our technical know-how with our decarbonisation roadmap process (SCORE), we were able to rapidly select an integrated configuration and optimise the performance benefiting all the project partners.

我们明确了范围, 区域要求, 时间表, cost and economic performance which the partners were able to use to support their application for government funding for the next phases of the project.

除了, we developed a publicly accessible interactive online tool and repository for sharing key information about the project. This allows users to familiarise themselves with the scope, performance and economics of the project; envisage the project development using GIS mapping and fly-through videos; explore the technical definition of project element scopes and directly access project deliverables; and run sensitivity cases on project economics.

The 亨伯零号项目 will form a significant element of the UK’s industrial decarbonisation strategy, making up one third of the Humberside industrial cluster. It is one of five locations – along with Teesside, 默西塞德郡, South Wales and North East 苏格兰 – identified as well-suited to early carbon capture, usage and storage (CCUS) deployment by the Committee of Climate Change (CCC).